Overview
The T-500 Plant uses manual production for cellular lightweight concrete, with a nominal output of 500 blocks per day. The configuration combines slurry and foam mixing with block moulds, without a cutting machine or bulk silos.
Production capacity
Nominal output: 500 blocks per day. Actual output depends on block dimensions, mix design, shift length, mould availability, curing and handling. Confirm the operating specification with our team.
Mixing & foam control
The hollow-bore shaft spiral mixer is designed to distribute pre-generated foam through the slurry with controlled mixing, helping preserve the cellular structure. Mix design, dosing, mixing time and quality checks are established during commissioning.
Operation
Manual production configuration. Site layout, utilities and staffing are planned around the agreed equipment specification.
Equipment configuration
- Slurry mixer
- Foam generation and mixing system
- Block moulds
Installation & commissioning
Discuss site layout, utilities, installation, trial batches, operator training and the scope of ongoing assistance in your project proposal.
Plan your facility
Share your location, factory area, target products, utility availability and intended start date. Our team will prepare an equipment and production-layout proposal.
Customer support
Access Nanolite’s engineering and customer support team for technical guidance, production recommendations, shipping assistance and after-sales support.